In this section, you can access to the latest technical information related to the FUTURE project topic.

Hydraulic analysis on ITER component cooling water system 2B

The ITER Component Cooling Water System 2B (CCWS-2B) is a closed loop which supplies cooling water to the clients of aluminum material. These clients include Coil Power Supply and Distribution System and Neutral Beam Injector (NBI) System. Due to the different modes of operation and hundreds of clients require different inlet pressure, a complicated hydraulic model is developed by means of AFT Fathom 9.0 in this study to perform the hydraulic analysis on CCWS-2B. Flow distribution in different building is investigated, and the pressure profile is presented in this study. Three solutions are introduced to improve the lack of fluid at some worst case point by using the current selected pump. The results obtained in this study can provide support and reference to the final design of CCWS-2B.

» Author: Wei Zhang, Bin Guo, Jie Zheng, Giovanni Dell'Orco

» Reference: Fusion Engineering and Design, Volume 121

» Publication Date: 01/10/2017

» More Information

« Go to Technological Watch



AIMPLAS Instituto Tecnológico del Plástico

C/ Gustave Eiffel, 4
(València Parc Tecnològic) - 46980
PATERNA (Valencia) - SPAIN

PHONE

(+34) 96 136 60 40

EMAIL

Project Management department - Sustainability and Industrial Recovery
life-future-project@aimplas.es