
AJUNTAMENT D'ALCOI
Website

Generalitat Valenciana
Website

Ayuntamiento de Valencia
Website

Cicloplast
Website

Ayuntamiento de Onil
Website

Anarpla
Website

Ayuntamiento de Mislata
Website

nlWA, North London Waste Authority
Website

Ayuntamiento de Salinas
Website

Zicla
Website

Fondazione Ecosistemi
Website

PEFC
Website

ALQUIENVAS
Website

DIPUTACI� DE VAL�NCIA
Website

AYUNTAMIENTO DE REQUENA
Website

UNIVERSIDAD DE ZARAGOZA
Website

OBSERVATORIO CONTRATACIÓN PÚBLICA
Website

AYUNTAMIENTO DE PAIPORTA
Website

AYUNTAMIENTO DE CUENCA
Website

BERL� S.A.
Website

CM PLASTIK
Website

TRANSFORMADORES INDUSTRIALES ECOL�GICOS

INDUSTRIAS AGAPITO
Website

RUBI KANGURO
Website
If you want to support our LIFE project as a STAKEHOLDER, please contact with us: life-future-project@aimplas.es
In this section, you can access to the latest technical information related to the FUTURE project topic.
Use and perception of ecosystem services on an urban river: a case from lower Gangatic plain, Eastern India
Rapid urbanisation and climate change have emerged as serious threats to ecosystem services (ES), and the deterioration of ES is affecting the quality of life. The research on ES was long performed from monetary perspectives and neglected evaluation of ES from social perspectives. This study proposes a social appraisal approach for evaluating urban river ES on Mahananda River in English Bazar Urban Agglomeration (EBUA), Eastern India, through the social perception and preference (SPP) approach. SPP approach was performed using the importance-performance analysis (IPA) model and satisfaction index (SI). Mann?Whitney U test, correlation analysis, and a median regression were performed to better understand the overall scenario on the perception and preference for ES. The findings of the study showed that (i) the stakeholder residing along the left bank of the river were highly dependent on provisioning ES; (ii) there was limited access to cultural ES provided by the river; (iii) the stakeholders residing along the left bank and slum stakeholders residing along the right bank of the river were more dependent on rive ES; (iv) relatively higher discrepancy was reported from recreation, aesthetic, and bio-diversity; (v) satisfaction level on ES was relatively low to the stakeholder residing along the left bank (50%); and (vi) as per improvement index (II), recreation, aesthetic value, bio-diversity, and purification of water must be prioritised to meet the societal needs. Thus, the study?s findings can be very effective in implementing actions for sustainable holistic river ES management through the SPP approach.

» Publication Date: 30/08/2022
C/ Gustave Eiffel, 4
(València Parc Tecnològic) - 46980
PATERNA (Valencia) - SPAIN
(+34) 96 136 60 40
Project Management department - Sustainability and Industrial Recovery
life-future-project@aimplas.es
