AJUNTAMENT D'ALCOI
Website
Generalitat Valenciana
Website
Ayuntamiento de Valencia
Website
Cicloplast
Website
Ayuntamiento de Onil
Website
Anarpla
Website
Ayuntamiento de Mislata
Website
nlWA, North London Waste Authority
Website
Ayuntamiento de Salinas
Website
Zicla
Website
Fondazione Ecosistemi
Website
PEFC
Website
ALQUIENVAS
Website
DIPUTACI� DE VAL�NCIA
Website
AYUNTAMIENTO DE REQUENA
Website
UNIVERSIDAD DE ZARAGOZA
Website
OBSERVATORIO CONTRATACIÓN PÚBLICA
Website
AYUNTAMIENTO DE PAIPORTA
Website
AYUNTAMIENTO DE CUENCA
Website
BERL� S.A.
Website
CM PLASTIK
Website
TRANSFORMADORES INDUSTRIALES ECOL�GICOS
INDUSTRIAS AGAPITO
Website
RUBI KANGURO
Website
If you want to support our LIFE project as a STAKEHOLDER, please contact with us: life-future-project@aimplas.es
In this section, you can access to the latest technical information related to the FUTURE project topic.
Analysis and optimization of 15-minute community life circle based on supply and demand matching: A case study of Shanghai
The 15-minute community life circle (15min-CLC) strategy is one of Shanghai?s important methods for building a global city and facing a society with a more diverse population structure in the future. In the existing research, the balance between the construction of the life circle and the needs of the people in the life circle still needs to be further fulfilled. This paper is based on the city?s multi-source large data set including 2018 AutoNavi POI (Point of Interests), OSM (OpenStreetMap) road network data and LandScan population data set, and evaluates the current status of Shanghai?s 15min-CLC through the fusion of kernel density estimation, service area analysis and other statistical models and proposes relevant optimization suggestions. The results show that there are the following shortcomings: (1) From the perspective of different types of infrastructure service facilities, the spatial construction of Shanghai?s overall life service facilities and shopping service facilities needs to be optimized. (2) From the perspective of comprehensive evaluation, the comprehensive service convenience of infrastructure service facilities in the downtown area is relatively high, while the comprehensive service convenience of urban infrastructure service facilities in the suburbs and outer suburbs is relatively low; The diversity of basic service facilities in the 15min-CLC in the downtown area is more consistent with the population distribution; However, in the peripheral areas of the urban area, too many infrastructure service facilities have been constructed. Based on the above shortcomings and the perspective of supply and demand matching, relevant optimization strategies are proposed in different regions and different types of infrastructure service facilities: (1) focus on the construction of basic service facilities in the urban fringe and urban-rural areas, improve the full coverage of the basic service facilities, and appropriately reduce the number of basic service facilities in the downtown area. (2) The development of community business models can be used to promote the development of new life service facilities and shopping service facilities. (3) Improve community medical institutions through facility function conversion, merger and reconstruction, etc. (4) Optimize the hierarchical basic service facility system and improve the population supporting facilities of basic service facilities in the 15min-CLC. This paper incorporates people?s needs and concerns on the living environment into the 15min-CLC evaluation model, and uses Shanghai as an example to conduct research, summarizes the existing shortcomings, and proposes corresponding optimization strategies based on the matching of supply and demand. This article attempts to explore a replicable 15min-CLC planning model, so that it can be extended to the Yangtze River Delta urban agglomeration, to provide reference for further research on the 15min-CLC, and to promote urban construction under the concept of sustainable development.
» Author: Haoyuan Wu, Liangxu Wang, Zhonghao Zhang, Jun Gao
» Reference: https://doi.org/10.1371/journal.pone.0256904
» Publication Date: 31/08/2021
C/ Gustave Eiffel, 4
(València Parc Tecnològic) - 46980
PATERNA (Valencia) - SPAIN
(+34) 96 136 60 40
Project Management department - Sustainability and Industrial Recovery
life-future-project@aimplas.es