
AJUNTAMENT D'ALCOI
Website

Generalitat Valenciana
Website

Ayuntamiento de Valencia
Website

Cicloplast
Website

Ayuntamiento de Onil
Website

Anarpla
Website

Ayuntamiento de Mislata
Website

nlWA, North London Waste Authority
Website

Ayuntamiento de Salinas
Website

Zicla
Website

Fondazione Ecosistemi
Website

PEFC
Website

ALQUIENVAS
Website

DIPUTACI� DE VAL�NCIA
Website

AYUNTAMIENTO DE REQUENA
Website

UNIVERSIDAD DE ZARAGOZA
Website

OBSERVATORIO CONTRATACIÓN PÚBLICA
Website

AYUNTAMIENTO DE PAIPORTA
Website

AYUNTAMIENTO DE CUENCA
Website

BERL� S.A.
Website

CM PLASTIK
Website

TRANSFORMADORES INDUSTRIALES ECOL�GICOS

INDUSTRIAS AGAPITO
Website

RUBI KANGURO
Website
If you want to support our LIFE project as a STAKEHOLDER, please contact with us: life-future-project@aimplas.es
In this section, you can access to the latest technical information related to the FUTURE project topic.
Analysis for bearing performance and construction mechanical behavior of supporting structure for the large cross-section tunnel by half bench CD method
Based on the engineering practice of large cross-section highway tunnel, this paper reveals the space-time coordinated evolution law of the construction mechanical characteristics and deformation distribution of the support structure in the construction by half bench CD method through field test. At the same time, the mechanical response calculation model of the supporting structure in the partial excavation is constructed, and the mechanical characteristics of the support structure in the partial excavation process are analyzed by above mechanical calculation model. Then, the mechanical and deformation distribution of the feet-reinforcement bolt in the steel frame?foot-reinforcement bolt combined support system is analyzed under different levels of surrounding rock load and different structural parameters of the feet-reinforcement bolt. The research results show that: (1) The internal force of the supporting structure changes most obviously during the excavation of Part ?, Part ? and Part ?, and the internal force of the support structure gradually tends to be stable after a slight increase in the excavation of Part ? and Part ?; (2) The horizontal deformation and vertical deformation of the support structure mainly occur in the excavation process of Part ?, Part ? and Part ?, and the excavation of Part ? and ? has little effect on the deformation response of the structure. The vertical displacement of the supporting structure is larger than the horizontal displacement, and the dynamic response of the temporary diaphragm structure during tunnel excavation is shrinkage-expansion-shrinkage-expansion; (3) The bending strain of each measuring point decreases with the increase of the distance from the loading point, and the bending strain of section 1 and section 2 is much larger than that of the other three sections; (4) With the increase of the angle, the section position with strain close to 0 gradually moves to the deeper position of the bolt, and the axial strain of each section on the bolt gradually changes from positive strain to negative strain.

» Author: Rui Zhao
» Reference: https://doi.org/10.1371/journal.pone.0255511
» Publication Date: 06/08/2021
C/ Gustave Eiffel, 4
(València Parc Tecnològic) - 46980
PATERNA (Valencia) - SPAIN
(+34) 96 136 60 40
Project Management department - Sustainability and Industrial Recovery
life-future-project@aimplas.es
