
AJUNTAMENT D'ALCOI
Website

Generalitat Valenciana
Website

Ayuntamiento de Valencia
Website

Cicloplast
Website

Ayuntamiento de Onil
Website

Anarpla
Website

Ayuntamiento de Mislata
Website

nlWA, North London Waste Authority
Website

Ayuntamiento de Salinas
Website

Zicla
Website

Fondazione Ecosistemi
Website

PEFC
Website

ALQUIENVAS
Website

DIPUTACI� DE VAL�NCIA
Website

AYUNTAMIENTO DE REQUENA
Website

UNIVERSIDAD DE ZARAGOZA
Website

OBSERVATORIO CONTRATACIÓN PÚBLICA
Website

AYUNTAMIENTO DE PAIPORTA
Website

AYUNTAMIENTO DE CUENCA
Website

BERL� S.A.
Website

CM PLASTIK
Website

TRANSFORMADORES INDUSTRIALES ECOL�GICOS

INDUSTRIAS AGAPITO
Website

RUBI KANGURO
Website
If you want to support our LIFE project as a STAKEHOLDER, please contact with us: life-future-project@aimplas.es
In this section, you can access to the latest technical information related to the FUTURE project topic.
TRAIN BULK CARGO LOADING SYSTEM HAVING DISCONNECTED RAILROAD TRACK MEASUREMENT SCALE
A train bulk cargo loading system having a disconnected railroad track measurement scale, comprising a disconnected railroad track measurement scale (1), a tractor (2), a lifting scraping plow (4), a controllable vibration charging hopper (6), a surge bin (8), a belt conveyor (9) and a control terminal (7). The disconnected railroad track measurement scale (1) is mounted on a side track line below a loading building; the controllable vibration charging hopper (6) is mounted below the surge bin (8), and a discharge opening is aligned with a cargo train (3); the lifting scraping plow (4) is used for performing leveling on the cargo loaded onto the cargo train (3); and the control terminal (7) controls uniform loading and transmits data to a backend for sharing. The train bulk cargo loading system having a disconnected railroad track measurement scale has a low total height and takes up less square footage, thus lowering the construction and production costs. The system integrates loading, storage, metering and data sharing, featuring uniform loading, balanced train wheel pressure, and accurate metering. Intensive waste in labor and resources, which is caused by uneven loading, large wheel pressure deviation and secondary metering, may be mitigated, thus significantly reducing the construction costs and operation costs.

» Number: WO2017152604A1 (A1)
» Publication Date: 14/09/2017
» Applicant: SHENZHEN ANSHUN ENERGY-SAVING TECH DEV CO LTD?[CN]
» Inventor: XIA QUANWEN?[CN]; AN TONGHUI?[CN] (3)
C/ Gustave Eiffel, 4
(València Parc Tecnològic) - 46980
PATERNA (Valencia) - SPAIN
(+34) 96 136 60 40
Project Management department - Sustainability and Industrial Recovery
life-future-project@aimplas.es
