AJUNTAMENT D'ALCOI
Website
Generalitat Valenciana
Website
Ayuntamiento de Valencia
Website
Cicloplast
Website
Ayuntamiento de Onil
Website
Anarpla
Website
Ayuntamiento de Mislata
Website
nlWA, North London Waste Authority
Website
Ayuntamiento de Salinas
Website
Zicla
Website
Fondazione Ecosistemi
Website
PEFC
Website
ALQUIENVAS
Website
DIPUTACI� DE VAL�NCIA
Website
AYUNTAMIENTO DE REQUENA
Website
UNIVERSIDAD DE ZARAGOZA
Website
OBSERVATORIO CONTRATACIÓN PÚBLICA
Website
AYUNTAMIENTO DE PAIPORTA
Website
AYUNTAMIENTO DE CUENCA
Website
BERL� S.A.
Website
CM PLASTIK
Website
TRANSFORMADORES INDUSTRIALES ECOL�GICOS
INDUSTRIAS AGAPITO
Website
RUBI KANGURO
Website
If you want to support our LIFE project as a STAKEHOLDER, please contact with us: life-future-project@aimplas.es
In this section, you can access to the latest technical information related to the FUTURE project topic.
CONTINUOUS FEEDING MECHANISM FOR ROTATING ELECTRODE ATOMIZATION POWDER PREPARATION, POWDER PREPARATION DEVICE, AND POWDER PREPARATION METHOD
A continuous feeding mechanism for rotating electrode atomization powder preparation, a powder preparation device, and a powder preparation method. The continuous feeding mechanism comprises: an electrode transmission chamber (10), a discharge port of the electrode transmission chamber (10) being connected to an atomization chamber (101), carrier rollers (12) for supporting an electrode bar material (100) being provided in the electrode transmission chamber (10), so that the axis of the electrode bar material (100) is aligned with the discharge port, and the carrier rollers (12) being configured to drive the electrode bar material (100) to rotate; and a material pushing component (30), provided in the electrode transmission chamber (10) and used for moving the electrode bar material (100) on the carrier rollers (12) from a first position to a second position along the axis of the electrode bar material (100). A gate valve (60) is provided between a transition material bin (50) and the electrode transmission chamber (10); when the gate valve (60) is opened, the transition material bin (50) is communicated with the electrode transmission chamber (10), and the electrode bar material (100) in the transition material bin (50) can be transmitted to the electrode transmission chamber (10); and after the gate valve (60) is closed, the transition material bin (50) can be communicated with the atmosphere, thereby achieving feeding and not interfering with a protective atmosphere environment of the electrode transmission chamber (10).
» Number: WO2024016488A1 (A1)
» Publication Date: 25/01/2024
» Applicant: SHANGI INSTITUTE FOR ADVANCED MAT NANJING CO LTD?[CN]
» Inventor: ZHAO BO?[CN]; WANG JIAN?[CN] (3)
C/ Gustave Eiffel, 4
(València Parc Tecnològic) - 46980
PATERNA (Valencia) - SPAIN
(+34) 96 136 60 40
Project Management department - Sustainability and Industrial Recovery
life-future-project@aimplas.es